Initial Care

  • Coating will dry within 24 hours.
  • You should wait at least 48 hours after final coat before walking on the floor.
  • Coating takes approximately 10 – 14 days to fully harden in which time care should be taken.
  • Soft shoes should be worn for the first 14 days. Example: Runners or slippers.
  • Furniture may be replaced after 40 hours.
  • Avoid dragging furniture over floor or wheeling on castors at any time as this will scuff, scratch or gouge the floor.
  • All furniture must be lifted into place.
  • Heavy furniture such as fridges, pianos, large cabinets etc. should be wheeled over sheets of masonite or ply to protect the floor.
  • Trolleys with rubber wheels should be wheeled over drop sheets.
  • Wait two weeks before placing mats on the floor.
  • Protective felt pads should be used on the bottom of furniture legs to avoid scratching the surface.

Professional floor sanding servicing greater Melbourne



Details

Phone 0411 267 236
ABN 42 132 772 562

Online Quote | Email us
http://dempstertimberfloors.com.au